Kyakatina

Works required:

  • Rework side hatch
  • Blacking
  • Replace all windows
  • Full paint job

27th Nov 2023 – rubbed down, primer and undercoat


Into the paint facility Nov 23


Rework side hatch October 23


January 2024 – all ready for window fitting

Painted and ready to go back in the water


Kyakatina back in the water, ready to head home.