The jobs we are currently doing.

January 2022

Boat 1: Built with the hull of the boat being used as a toilet tank. Works involve organising boat surveyor to check integrity of hull. Cutting either side of boat to expose tank. Cleaning out years of residue (we get all the good jobs). Welding the sides back up. Blacking where it has been cut. Fitting anodes. Then internally making good above tank. Fitting a new plastic tank under the bed, fitting a macerator toilet. Making all good.

Boat 2: Full repaint

Boat 3: Remodel of bathroom and galley, to include removal of most of the current bulkheads, moving the bathroom bulkhead to give a little more room. Replacing original bath, with shower over with a shower cubicle. Galley to involve new cupboards, new cooker, replacement of sink.